DOCUMENTATION / CATEGORY
Delivery
What to prepare before the cabinet arrives, and in which order to accept it on site. These two documents turn the parts that most often stall a delivery into checklists and standards.
01一体柜交付智脑 WorkMesh
《WorkMesh 液冷一体柜物理部署环境检查清单(配电 / 水冷 / 承重)》
一体柜到货前若漏查配电、水冷与承重条件,现场就会停工返工;这份清单逐项列出配电、散热、承重与网络接口的自查要点,建议在签合同前完成核对,并把冗余与运输通道一起确认。
2 min readRead ↗
02硬件与一体柜智脑 WorkMesh
WorkMesh 液冷一体柜环境准备与现场交付标准规范
私有化一体柜交付常因机房环境没准备好而延期;本文给出交付前的配电、散热、承重与网络自查项,从到场定位到验收移交的标准流程,以及 GPU 识别、存储与带宽的验收口径。
2 min readRead ↗